Support and service

We provide high quality technical support, maximizing returns on generation by optimizing plant performance.

On site services

BOKAhydro equipment packages are specifically designed to minimise unscheduled downtime and our after-sales service is available throughout the life of each project including:

  • Site installation or supervision of installation of electro-mechanical equipment
  • Commissioning of electro-mechanical equipment
  • Education and training of client operating stuff
  • After sales services of power plant equipment
  • Site inspection
  • Energy recovers with rotation parts in new profile for all kind of turbine runners
  • Renovation of old plants and equipment
  • Making reverse engineering

Scheduled maintenance; Consumables & Spare Parts

We provide regular maintenance including:

  • Elaboration of scheduled maintenance programme
  • Execution of scheduled maintenance & service works
  • Listing of necessary spare parts for uninterrupted operation procurement of spare parts with continuous refilling
  • Listing of consumables (grease and oil filling, filters, packing etc.) procurement of consumables with continuous refilling
  • Report on performed maintenance

Remote control support

Fully automated SCADA system through WebSupervisor 4.0 App provides live insight:
  • Operational status
  • Current power output of each hydro turbine
  • Pressure/Vibration/Temp. values
  • UPS and Generator values
  • Run hours/Production from day one
  • Failure state
and allows:
  • Error handling and notifications
  • Monitor, control and modify parameters
  •  Yearly update of parameters
  • Possible corrections via modem (internet connection)
Application is optimized for mobile devices

Plants performance optimization

Optimization services are based on thorough site inspection, analysis of historical operation records and a review of abstraction and impoundment limitations. Mainly the following amendments to:

  • Making reverse engineering
  • Case studies of governor, automation and remote control systems
  • changes in operational regimes
  • Energy recovers with rotation parts
  • Refurbishment of existing governors
  • Remote control system (SCADA) applications
20161230_100656 (2)

Pelton turbine installation

Given the Economic viability of the project and the Characteristics of the hydro-electric power plant, we advise different designs of Pelton turbines.